COFFOR is 2 to 3 times faster than other traditional construction systems. As a general rule, it takes 18 to 29 hours to install and pour 1m3 for column and beam while it takes 3 to 4 hours with COFFOR walls.
Concreting with a pump
No stripping as COFFOR stays in the wall.
Possibility to pour a whole floor in one pass: reduces preparation time and eliminates lost ime in rotating standard formwork.
Time spent placing thermal insulation is eliminated: COFFOR INSULATED already integrates the insulation material - eliminating the necessity to come back to place it.
All types of finishing bond exceptionally well due to the COFFOR herringbone rib lath.
Close view of COFFOR
after concreting
Anti-cracking welded wire is no longer necessary: given the presence of the C profile, the rib lath, their proper bonding to the concrete and their respective steel section, the anti-cracking welded wire ( a requirement with traditional waterproof formwork) is eliminated. In addition, the rapid elimination of excess water decreases concrete shrinkage, dramatically reducing the occurence of cracks.